Showing posts with label team hexagon. Show all posts
Showing posts with label team hexagon. Show all posts

Saturday, October 1, 2011

Team Hexagon Alteration Conclusions

After two weeks of working on our experiment, today all the Real-World Alteration Mod groups presented their observations to the class. Team Hexagon GOOOO!

  Day 1:
 

  Day 2:
RAINNNN. It totally skewed our results. The vast majority of people avoided the tiles because they were slippery 8(

  Day 3:


  Day 4:
Done setting up for the last day! We were all so tired, but so happy. We ended up going through all twelve rolls of tape we had bought though (except for some packaging tape, which is dangerously flimsy, as mentioned), so we didn't end up putting as many tiles on the walls as we had wanted 8\



I'll spare you guys all the graphs we put in our presentation |D  After class I also found out that Eric Gingrich (our teacher), Robert Cooksey (my amazing GAD teacher from last year), and Bryan Shannon (a well-known Junior GAD) had all come across the game at the same time the other day and discussed it curiously and were playing with it together LOL. He said they all really enjoyed it too, haha. I wish I had seen it! Hearing that pretty much made my day.

Monday, September 26, 2011

Team Hex - Days 1 & 2

Team Hexagon has met a few times a day for the last few days, and we're only at the beginning of day 3! The days before Day 1 we met a few times to buy all of our supplies, cut out all 200 hexagons, and tried to find a place on campus to get them laminated, but never found out where it was, so we used the plastic sheet covers we bought instead. We cut those out for each hexagon, put the hexagon inside and folded over the extra edges of the sheet, then taped each fold so it laid flat against the hexagon. Even with help from some friends, it still took a few hours! The most tiring work was taping down each edge of every hexagon in formation on the ground in the hallways. We used clear packaging tape, which ended up not being the best choice because it was so light and not as sticky as we had hoped. After observing the day before, we decided to only place the tiles down on one hallway (the one running from Outtakes towards North Hall), because the other barely received any traffic at all. Because of this, we also moved the second "Day 1 - Level 1" sign from the other hallway to the beginning of this game (right outside the doors of Outtakes). For Day 1 the hexagon configuration was straight, evenly spaced tiles.
Spencer and Diana graciously helped us set it up, so here's a picture of the tired team (plus Spencer haha) when we were finished.

Day 1: When we came back to observe the next day, two of the tiles had already ripped up, but we left them as they were so it wouldn't skew the pattern, and observed people for a couple hours.
Hyung-Min set up his camera to his laptop remotely so he could take sneaky pictures and video around the corner and watch from his laptop screen.

Day 2: The tile formation ended up more complex than we had thought. In theory, each color would just cross to reach the opposite side of the hallway by the end, but in the middle they all ended up crossing and it got a little crazy. We had also gone out and bought a new kind of tape - good old duct tape - since the packaging tape hadn't worked out.
Here's the team partway into setting it up.
 
And finished!

Yeah. It was a good thing we switched out the tape, because today (Day 2 observation) it rained pretty hard most of the day, but the new tiles still held up 8)  They not only stick much better, but also look nicer in the way they frame the tiles, and are more noticeable as well. Why did we ever question duct tape?

On to Day 3! I'll make another post with more pictures and all of our observations for all four days along with our notes.

Tuesday, September 20, 2011

Real-World Mod Proposal

Hacking the real world is fun c8  Here's the final presentation slide I put together for Team Hexagon's real-world alteration proposal (as discussed in my last post) :


I keep getting more and more excited for this, it's going to be so awesome haha. I MUST TAKE VIDEOS.

Monday, September 19, 2011

Hexagons and Cameras

After every Game Design student did their own real-world observations of an everyday mechanic, four favorites were chosen and we broke down into groups. Our first group meeting for the continuation of the project, the "real-world alteration" project, was today, and it was extremely productive. We figured out everything we're going to do and set out a time-line for the next two weeks, as well as put together our document layout for presenting our alteration. Christina Auo, Hyung-Min Mun, and I have named our group Team Hexagon. I made a logo for our group to use for the presentation.
Our mechanic is walking, specifically down the long, narrow hallways along either side of Searing Center, where there are no doors and nothing to look at but the blank, enclosing walls and the pathway ahead. Instead of this walk being a boring journey, since most CA/GAD kids have to do it several times a day, we wanted to make it into a game. Using red, yellow, blue, and black paper, we're going to cut hexagons and place them in paths along the ground down the length of both hallways for them to take like stepping-stones. Like walking on only the black tiles on a black-and-white checkered floor, or hopping from one lonely blue tile to another in a grocery store, we're hoping people will choose the color they like most and predictably step from one tile to another along the path, making it into a game for themselves. Some people might be wary and try avoiding the hexagons altogether, but it's a tendency for people to make things into a game, especially when they're not being engaged. We're going to be observing what people do over the course of four days, changing up the tile's configurations each day. Starting with Level 1 on the first day (indicated by a poster at the beginning of each hallway), the tiles will be straight-forward and evenly-spaced, but each new day will bring a new Level - Level 2 will have the color paths cross over one another, Level 3 will have large spaces between each tile, and Level 4 will have the color tiles scattered and weaving everywhere. Watching people step along the paths is going to be so amusing. This is going to be so much fun c8

Team Hexagon at work! And here's the presentation layout rough we came up with:


I also fixed up my Alleyway level a bit more today and cut down on some areas, and I think the layout and everything is pretty much done! I set up my still-shots and cinematic camera fly-through and now we're going to start detailing and dressing our environments c8 GOOD STUFFS.